All about Civil Engineering

All about Civil Engineering...


Wednesday, September 26, 2012

SBG Launching Using Segment Erector


SBG Launching Using Segment Erector. This method will be used to launch the SBG at 65m and 100m special crossing span (ie Balance Cantilever method). MC are using Low Segment Erector due to high recstriction due to overhead HT cable.

 
 
 

No comments: