Al Muhandis Notes...
All about Civil Engineering
All about Civil Engineering...
Wednesday, September 26, 2012
SBG Launching Using Segment Erector
SBG Launching Using Segment Erector. This method will be used to launch the SBG at 65m and 100m special crossing span (ie Balance Cantilever method). MC are using Low Segment Erector due to high recstriction due to overhead HT cable.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment