The marine bored piling was using RCD method. This RCD method required permanent casing and only suitable for granular soil i.e Sandy Sand. Normally driven pile will be used for the foundation of marine bridge, but for some cases, marine bored pile shall be used for sensitive area where vibration and settlement are not allowed.
All about Civil Engineering
All about Civil Engineering...
Wednesday, January 9, 2013
Marine Bored Piling
The marine bored piling was using RCD method. This RCD method required permanent casing and only suitable for granular soil i.e Sandy Sand. Normally driven pile will be used for the foundation of marine bridge, but for some cases, marine bored pile shall be used for sensitive area where vibration and settlement are not allowed.
Saturday, December 29, 2012
Tuesday, December 18, 2012
Friday, November 9, 2012
Sunday, October 28, 2012
Tuesday, October 16, 2012
Tuesday, October 2, 2012
Monday, October 1, 2012
Cost for 2 Overhead Signage Gantry
Cost for 2 Overhead Signage Gantry at P79 and P87 is 165k...same price with 5 years old re-condition Estima. Hmmm...
Blast Wall at Stn 4
8 meters height Blast Wall is designed at Station 4. What is the function of this BLAST WALL?
Saturday, September 29, 2012
How to build a house using IBS system?
Build a house using IBS system, It's fast, clean, cheap, good quality and the most important thing is environmental friendly. But how to build a house using IBS system? This video will explain everyting, enjoy viewing...
Friday, September 28, 2012
Subscribe to:
Posts (Atom)






